johnka37 johnka37
  • 24-05-2018
  • Mathematics
contestada

If a job can be completed in 4 hr, then the rate of work is __ of the job per hour.

Respuesta :

hhong2021 hhong2021
  • 24-05-2018
1 divided by 4 is 0.25 or 1/4
Answer Link
mmpeachey107
mmpeachey107 mmpeachey107
  • 24-05-2018
To find the rate of work, split up the hour by 4. So, 1 divided by 4.  This makes .25 (also written as 1/4).  So the rate of work is 1/4 of the job per hour.

Hope this helps! Can I have Brainliest? :)

Answer Link

Otras preguntas

Elijah is writing a literary argument about William Shakespeare's Julius Caesar. His essay argues that Brutus is a character who symbolizes loyalty because of h
Which fraction would make this equation true? 4x ? = 6 2/3
Why did the U.S. enter World War I?
True or false NEED ANSWERS ASAP
What does Hitler ban in Nazi Germany after he is elected Chancellor in 1933?
22. Which of the following are examples of mixtures? I a jar of nuts and bolts II trail mix consisting of a variety of nuts and dried fruits III carbon monoxide
Luke and paige were running a relay race the race was 22.875 kilometers total if luke ran 6.276 kilometers how far did paige run
Every day a 6th grade class puts candy into bags to prepare for Valentine's Day. They put 7 pieces of candy in each bag. If they make 28 bags in 4 days, how man
anti abortion or pro choice and why this is for my class i need at least one pargraph why and would u still support if ur friends got one?
Cora read one sixth of her book on day one. She read one fourth of her book on day two. What fraction of her book did she read in two days?