Cost center responsibility reports typically focus on the flexible budget variance.
a. True
b. False

Respuesta :

andriansp andriansp
  • 30-08-2018

That statement is true

Budget variance refers to the difference between the expected amount of the budget with the actual amount of the budget. The difference in budget variance tend to be influenced mostly by the number of externalities that arise during operation (such as natural disaster or accidents)

Answer Link

Otras preguntas

You're at a party and someone pressures you to take some Ecstasy. What's the best way to say no?
How do you find volume? I need to find how to find volume for a math sheet I have for school and I don't feel like asking anyone.
Solve for a. c = \pi a b Answers? 1) c/8 = a 2) c/8\pi = a 3) 8 \pi b c = a 4) c / 8\pi b = a
what would happen if you added saltwater to a plant
The angle of elevation to the top of a 30-story skyscraper is measured to be 2 degrees from a point on the ground 5,280 feet from the building. What is the heig
how do the location and climate of the united kingdom and russia affect how each country conducts trade
2.3, 2 4/5 and 2.6 in order
In 1980, the number of African elephants was 1,200,000 but that number was decreasing 5.25% a year. How many years did it take for the population to reach 1/2
what are the 2 sides of a sand dune
On graduation day, Jon walked across the auditorium stage, proud of what he (accomplished) choose the correct form of the verb in parentheses A. Had accomplishe