raj549985
raj549985 raj549985
  • 25-07-2019
  • Mathematics
contestada

Qn.11 plz help this with step ​

Qn11 plz help this with step class=

Respuesta :

salatulmaghrib
salatulmaghrib salatulmaghrib
  • 25-07-2019
The answer is 7.5 days
explanation:
80 is four times 20.
80 people should be able to do the job four times faster than 20 people.
So, they should take 1/4 the time.
If 20 people take 30 days, 80 people should take 30/4=7.5 days.
**
simpler explanation:
30*20/80=7.5
Answer Link

Otras preguntas

State the area of the given parallelogram. A: 35 Units Squared B: 28 Units Squared C: 70 Units Squared D: 11 Units Squared
What is Christmas facts for kids?
The image below shows impact craters on Mercury. When meteoroids strike the planet, these craters are left behind. The image above shows the craters from afar a
International economic conference on stabilizing currency that was sabotaged by FDR
Qué tienen en común “La canción del bongó”, “El apellido” y “Majestad negra”?
i need help desperately please don’t ignore!! :( LN= 5x-8 NM= 12 m find the value of x
Select all the correct answers. which three factors led to the great recession of 2008?
company estimates the company will incur in overhead costs and direct labor hours during the year. actual direct labor hours were . calculate the predetermined
i f the federal reserve wants to weaken the usd against the yen what action will it take (1 point)
PLEASE SOMEONE PLEASE HELP