A/an ___________ is a scheduling tool that sets the standard and nonworking time for the project and is used to assess how tasks and resources are scheduled.

Respuesta :

Аноним Аноним
  • 25-02-2020
The answer is a calender
Answer Link

Otras preguntas

What occurs when there is a lot of money in circulation, but it is worth less and prices are rising? A. inflation B. shortage C. deflation D. recession
how do we round 8.373 to the nearest hundredth?
how do I show six less than a quotient of a number and two equals fifteen
seven cakes cost £2.10 how much do ten cakes cost
Whole animal cloning puts a nucleus from a cell of one animal into A. the chromosome of a bacterium. B. the plasmid of a bacterium. C. an egg cell from another
eliminate 3x+2y=4 8x-3y=-6
John is a farmer who wants to keep his soil as productive as possible. Which of these actions would help him achieve this goal? excessive irrigation crop rotati
fairs were an important part of a
Suppose the human gene coding for hemoglobin is inserted into a bacterial plasmid. A bacterial culture is transformed with the recombinant plasmid. Which of the
under Franklin Roosevelt good neighbor policy