jeancalixteosmi3726 jeancalixteosmi3726
  • 21-12-2020
  • Business
contestada

Which type of control chart should be used when it is possible to have more than one mistake per​ item?
A. c​-chart
B. p​-chart
C. x​-bar chart
D. R​-chart

Respuesta :

hyderali230
hyderali230 hyderali230
  • 23-12-2020

Answer:

A. c​-chart

Explanation:

C chart is a control chart that is used to count the data like numbers of nonconformities per unit. It is used to monitor the total occurrence per unit.

In this chart, the data is collected in the sub-groups and then the data is analyze to check the defects or mistakes or nonconformities.

If there is more than one mistake per item the C- chart is the best match.

Answer Link

Otras preguntas

How can e-waste lead to health and safety issues?
Question 6 10 points In one case, the pilot of an Airbus A320 jet with 200 passengers on board fought to prevent a crash. The aircraft would not turn left no ma
Geometry question! Help!
Work out the surface area.​
Three brothers, Jarek, Jerzy and Justyn, share a block of chocolate in the ratio of their ages. Jarek gets half of the bar. Jerzy gets 3\5 of the rest. Work out
A rise in wages could be due to:
Skyscrapers solved housing and ____ issues in large cities. A. office space B. sanitation C. transportation D. entertainment
who do the boy encounter when they run away from home? ''TOLD IN THE DROOLING WARD''
Any two differences between second generation and third generation Write any generation computer.​
Identify the vertices of the feasible region for the given linear programming constraints. System of Linear Programming: z=−3x+5y x+y≥−20 x−2y≥−2 x−y≤2 Fill in