alexaddictedjc alexaddictedjc
  • 24-05-2021
  • Computers and Technology
contestada

How should work be allocated to the team in a Scrum project?

Respuesta :

kennethvaughn6
kennethvaughn6 kennethvaughn6
  • 24-05-2021

Answer:

In a Scrum project, the work or the tasks are not allotted specifically. The Scrum Master is not allowed to assign tasks to the team members under any circumstance. Once the client provides the details regarding their requirements in detail, the tasks are distributed based on the expertise and skills of the employee.

Explanation:

Answer Link

Otras preguntas

find the area of a triangle with sides 8 equals 5 b equals 8 and C equals 11
I need help!! Please.
factor the expression 25x^2–4
A car travels at an average speed of 64 miles per hour. how many miles does it travel in 4 hours and 45 minutes?
1. Write an essay describing three innovations of the late nineteenth and early twentieth centuries and their effect on life in the United States.
Consider a steel guitar string of initial length l=1.00m and cross-sectional area a=0.500mm2. the young's modulus of the steel is y=2.0×1011n/m2. how far (δl) w
Water on the kitchen floor at home is considered a safety hazard.
If Lisa reads 5/8 pages in 2/3 minutes, how many pages does she read in one minute?
The mixture you separated was mixture of iron filings, sand, and salt. Based on your understanding of matter, is this mixture a homogeneous mixture or heterogen
Read the passage and then answer the question that follows. I made straight for the ship, roused up the men to get aboard and cast off at the stern. They scram