How much time will (4,10,14,16,18) workers take to do the job?

Respuesta :

Аноним Аноним
  • 21-06-2017
In this problem, the number of workers working on a single project should be inversely proportional to the time needed to finish the project. In this case, the function should be f(x) = 1/2^X. Hence with x equal to {4, 10, 14, 16, 18}, then f(x) is equal to {0.1, 0.4, 0.6, 0.8, 0.9}
Answer Link

Otras preguntas

a beaker placed over a coin contains a block of glass of thickness 12cm.over this block of depth 20cm.calculate the vertical displacement of the coin and hence
Find the value of A if the 4-digit number 3A5A is divisible by 15.
LESSON 8.2 Find the measure of the arc or central angle indicated. Assume that lines which appear to be diameters are actual diameters.
PERSIAN GULF WAR-- Information about the 1) who was involved, 2) what happened, 3) when did the war take place, 4) where did it occur, and 5) :))
find the area of the shaded section ABC​
 may I please get help
ratio Drag the right word to its synonym constant invariable coordinate plane
How does the flashback about Abuela's first love letter affect the story? It begins a subplot by creating a mystery that Bella is determined to solve. It create
What did many Europeans believe was their duty? Group of answer choicesFeed the poorObey the kingSpread ChristianityTeach the poor
Change. 0.99 into a present Change 0.62