Relative to the project's life cycle, when is the cost per risk discovered typically highest

Respuesta :

andriansp andriansp
  • 01-12-2017
Relative to the project's life cycle, the cost per risk discovered is typically highest during the end of closing of a project.
For any project, a lot of risk will only be spotted after the company started its own operation. Because up to this point, the company usually already determine which type of risk is the most likely to happen.
Answer Link

Otras preguntas

the base of a pyramid is equilateral triangle of side 8cm long. If the altitude of the pyramid is 15cm ,find it's volume​
"Assume that a man and a woman are phenotypically normal, but the woman is heterozygous for a pericentric inversion on chromosome 8. The man is karyotypically n
(a^2-b^2) (c^2-d^2) +4abcd​
Which integers satisfy the inequality 2 < x ≤ 6 ?Please help if you are in year 8 and know math!
In the experiment, 40 mL of 3 M sodium hydroxide is used to extract the benzoic acid. In order to recover the benzoic acid from the aqueous solution, 6 M hydroc
Please help will be marked BRAINLIEST!
what is 0.035 as a simplified reduced fraction
NEED HELP ASAP WILL GIVE BRAINILESS!!
Can someone help with this
What happens when two sound waves meet in constructive interference? A. The frequency increases. B. The sound disappears. C. The sound gets softer. D. The sound