Which of the following is considered a major process flow structure?
a. Lean Manufacturing
b. Project
c. Fabrication
d. Lead Time

Respuesta :

frontloader13 frontloader13
  • 22-11-2015
Since lead time is the time period between the starting and completion of producing a product, lead time is a major process flow structure.
Answer Link

Otras preguntas

in the presence of a regulatory protein the lac operon is _____.
soy argentino. vivo en españa.El es de españa.true orfalse ​
what climate and growing conditions does corn require
why is the day after thanksgiving called black friday?
Please help me sort this time line NO LINKS PLEASE
si je ferme les yeux je me souviens des votres translation
What is the best way to torture an ant
hsdfhedrjeryeruerueru
If you drop your keys from the tallest building in San Antonio, how fast will they be falling after 3 seconds? 9.8 m/s 0 14,7 m/s 29.4 m/s 44,1 m/s
when a company or brand measures the loyalty of its consumers who will repurchase or continue using its brand’s product or services, which psychological process